©NovelBuddy
Previous chapter:
Chapter 139 - Factory
Next chapter:
Chapter 141 - Written Test
PREVIEW
... uare-meter operation room and an 80-square-meter disinfection room.
On the left side of the operating room, there were five large boiler stoves against the wall. In the corner next to the stove, there was an operating table with running water equipment. In the middle of the room, there were a few long tables for the operating table for storing food. The remaining space was filled with rows of custom-made wooden shelves that were 1.5 meters tall. Each floor was separated by 30 centimeters ...
YOU MAY ALSO LIKE