PREVIEW

... e Davids have to pay 600 million US dollars in liquidated damages. This amount is quite huge, so the Davids can't bear it. .

Although the early warning aircraft can no longer be sold, it is still possible to disassemble and sell the technology inside. By selling the technology, part of the liquidated damages can be offset, so that the loss can be reduced. After all, the Davids are the most business-oriented nation in the world. .

  For example, for the production of this T/R compon ...

YOU MAY ALSO LIKE
Chaos Devourer SystemChapter 748 Passing The Test
 49k
4.5/5(votes)
ActionAdventureFantasy

In a future timeline...

The entire world underwent a heaven-defying change as planet Earth was forcefully shifted away from the Milky Way Galaxy to another Galaxy by some unknown forces.

A New Galaxy completely out of their wildest imagination.

A new type of cosmic energy known as Mana invaded Earth, transforming its very essence as the world witnessed its regular norm shattered into pieces.

The cosmic energy entered into the human body as it forcefully awakened new genes in them which were once thought to be a myth.

The world's rules were forcefully changed as it became a place where only getting stronger mattered and only those with the most powerful genes were worthy of respect.

The strength of humanity grew and so did their curiousness making them emerge out of Earth and explore the new universe but they were shocked by what they saw.

Powerful alien races who were far beyond them in technology and comprehension of Mana, world-devouring existence, unexplored worlds, and cosmos.

This Universe was simply boundless and the word “impossible” does not exist.

The story follows a young man named Zeras Celestria, a descendant of one of the Nine Families who was deemed trash and sold out to a dark force that uses humans for experiments, due to his inability to awaken the Celestria family's powerful A-grade Lightning Hammer Gene, and instead awakened the trashy F-grade Multi-colored hair gene.

Thrown into a pile of dead bodies who were deemed experimental failures and life slowly seeped away from him.

Zeras clenched his teeth tightly as a mad taste for revenge flickered in the depth of his eyes, but also with a tint of helplessness.

That was until...

“Congratulations.”

“Host has been blessed by Chaos.”

“Host has successfully awakened SSS-grade Chaos Devouring Gene.”

Armed with an SSS-grade Gene and an undying will for revenge.

Zeras embarked on a path to becoming the strongest and dominating the limitless universe.

A path many embarked on but none ever succeeded.

-- -- --

A Future Scene...

“Look Into My Eyes, What do you see...” A young man, with white hairs like the purest snow, pairs of lips redder than blood, and a face crafted by perfection itself.

Yet those eyes, no they couldn't be called so... They were instead unending black-hole of...

“I see Death, Madness, Pain, And...”

“Yes, I'm The Last Embodiment Of Chaos...”

……………………………………………………………

Dear readers! Without any ads, maybe you will prefer .

The Valiant Farmgirl's Blackhearted Husband Wants a HugChapter 470 - : Bonus Huangfu Wudi (2)
 14.8k
4.0/5(votes)
RomancePsychological

Qin Xiaoyao transmigrated one day, becoming the recently married wife of the Song Family, whom everyone in the village scorned for being poor and desperate.

Her mother-in-law was sick, while her uncle and aunt were very young.

Her husband was gorgeous but was bed-ridden with illness.

They all lived in a small straw hut and would survive daily on what rice and soup they could scrape together.

However, she was the very cause of their desperation.

As the youngest daughter of a butcher, her father forced this marriage on her because of her husband’s good looks and scholarly title.

She married Song Que precisely like she wished but could not bear the life of poverty and had very much dug herself a hole.

Glancing at her own round figure, she sighed.

It turns out that she was the one who was tricked instead! Female lead: A woman from the future.

Strong physically but also possess superpowers.

A sucker for good-looking men. Smart.Male lead: Reincarnated. An evil-looking man who was ruthless.

A comedy with strong lead characters.

Welcome to your new pit, dearies.

Accompanying the PhoenixChapter 81
 1.9k
4.3/5(votes)
RomanceXianxiaShoujoFantasy

Of the ancient gods only one remained in the world. This god lived alone for thousands of years and no longer had any desires. Legend had it that during the great war between the worlds he used his powers to turn the tide managing to seal the cataclysmic rift bringing order back into the three realms. Time flew by and hundreds of years passed in the blink of an eye.

Transmigrated as the fake young master, I'll beat up the scumbags and b*tchesChapter 353Vol. 1 - - Disaster
 13.1k
4.2/5(votes)
ComedyFantasyHaremRomance

I transmigrated into the body of the Villainous Young Master.Why am I a fake while everyone else is real?!The real Young Master wants to oppress me. Even my fiancee wants to break off our engagement.Bring it on, then!Just when HuMing was about to beat up the b*tches and scumbags, the gazes of the girls around him became increasingly strange.“Didn’t we say only to cooperate?”“Well, we’re just here for our payment.”The gentle smiles on the girls’ faces made HuMing weak on his knees.