©NovelBuddy
Read now ->
Tunnel Rat - Chapter 358: Experimental Projects
Previous chapter:
Happy New Year! The Walrus’s plans for 2025, and AMA.
Next chapter:
Chapter 359: Deep Planning Session
PREVIEW
... that housed the entrance to the recently built tunnel that led to the Deep Rock Engineering complex deep beneath Shadowport. The dwarves had dug the tunnel they called 'The Loophole' to the surface to recover all the parts of Leviathan and planned to send the repaired ship back the same way, then assemble the parts in the half-built drydock before launching her and beginning the project of recovering what was left of the Iron Queen. Rebuilding Leviathan was a huge task, but doing the same for t ...
YOU MAY ALSO LIKE