©NovelBuddy
                                Read now -> 
                                
                                    Tunnel Rat - Chapter 391: Cracked Rock
                            
                                                            
                                    Previous chapter: 
                                    
                                        Chapter 390: You have Gotten Better at Tunneling.
                                
                                                                                        
                                    Next chapter: 
                                    
                                        Chapter 392: Heirs to Madness
                                
                                                    PREVIEW
... onstruct a bridge across the chasm. Bridging small fissures and leveling out the caverns they drilled into was a daily job, and building a road across a deep fissure was only slightly more complex. First, a temporary bridge section only two feet wide was constructed and slowly moved forward over the abyss. A cable running from the end of the section to a pulley embedded in the roof of the tunnel gave the dwarves a way to keep the end from sagging. As soon as the end of the section was dropped in ...
YOU MAY ALSO LIKE
 
                                
























